Apartment - Rim, Maksimir, Zagreb, 62m2
Apartment - Rim, Maksimir, Zagreb, 62m2
Apartment - Rim, Maksimir, Zagreb, 62m2

€304,437

Apartment - Rim, Maksimir, Zagreb, 62m2

Rim, Maksimir, Zagreb

Surface

62.13 m2

Rooms

2

built in

2028

Description

APARTMENT, SALE, ZAGREB, MAKSIMIR, RIM, NEW BUILDING, 3-ROOM, 62.13 m2 balcony, parking

In a quiet area surrounded by greenery in Maksimir, in RIM, a three-room apartment is for sale on the first floor of a new building with an elevator.

The apartment is located in building D, which has only four residential units distributed over three floors. The entire project consists of four smaller residential buildings with a total of 16 apartments, situated in an environment that provides peace and privacy while allowing for a pleasant urban lifestyle.

The apartment has a closed living area of 52.63 m2 and consists of an entrance hallway, a living room connected to the kitchen and dining area, two bedrooms, a bathroom, and a separate toilet.

From the living area, there is access to a balcony of 6.73 m2, which provides a pleasant outdoor living space.

The total actual area of the apartment with the balcony is 59.36 m2, or 57.68 m2 of calculated area.

The apartment includes a storage room in the basement with an area of 2.66 m2 and an outdoor parking space with an area of 12.50 m2, which are included in the price. The total calculated area of the apartment with attachments is 62.13 m2.

The purchase of a garage parking space is mandatory for an additional fee.

CONSTRUCTION AND EQUIPMENT

The project is designed with an emphasis on construction quality, energy efficiency, and living comfort.

The building has a reinforced concrete structure, an ETICS facade system with a final silicate plaster, and a flat roof with waterproofing.

Aluminum exterior joinery with insulating glass and protective coatings, as well as interior wooden doors, are planned.

Heating is provided by an air-water heat pump, underfloor heating in the bathrooms, and electric bathroom radiators.

The surroundings of the buildings will be landscaped with low and high vegetation.

COMPLETION OF CONSTRUCTION

The completion of construction is expected in the spring of 2028.

The displayed images are visualizations of the project. The final calculated area of the property will be determined by the condominium elaboration.

For additional information about the project, availability of apartments, and purchase conditions, please feel free to contact us.

Energy label: A+

Key features

  • Parking place
  • Elevator
  • Air conditioning
  • Adapted for disabled

Location

Nearby available properties